Integration testing tests interfaces between components, interactions with different parts of a system, such as the operating system, file system, hardware, or interfaces between systems. There may be more than one level of integration testing and it may be carried out on test objects of varying size. For example:
1. Component integration testing tests the interactions between software components and is done after component testing;
2. System integration testing tests the interactions between different systems and may be done after system testing. In this case, the developing organization may control only one side of the interface, so changes may be destabilizing. Business processes implemented as workflows may involve a series of systems. Cross-platform issues may be significant.
The greater the scope of integration, the more difficult it becomes to isolate failures to a specific component or system, which may lead to increased risk. Systematic integration strategies may be based on the system architecture (such as top-down and bottom-up), functional tasks, transaction processing sequences, or some other aspect of the system or component. In order to reduce the risk of late defect discovery, integration should normally be incremental rather than “big bang”.
Testing of specific non-functional characteristics (e.g. performance) may be included in integration testing. At each stage of integration, testers concentrate solely on the integration itself. For example, if they are integrating module A with module B they are interested in testing the communication between the modules, not the functionality of either module. Both functional and structural approaches may be used.
Ideally, testers should understand the architecture and influence integration planning. If integration tests are planned before components or systems are built, they can be built in the order required for most efficient testing.